Well, the quilting is, now I have to fix my spike and fix a pucker, but I'll do that on Ruby Deluxe. It was actually too thick for the HQ16 to handle. I may go ahead and trim it so it's easier to handle.
Here it is on a king-sized bed, but it's a double. Still need to add buttons and some hand embroidery. This was a time intensive quilt. I learned a lot of about long-arm quilting and I wish I could do it over because I would have made a plan for the quilting so there wouldn't be as much over stitching as I ended up doing. Can't see it from 10' away so I'm dealing with it.
Here it is on a king-sized bed, but it's a double. Still need to add buttons and some hand embroidery. This was a time intensive quilt. I learned a lot of about long-arm quilting and I wish I could do it over because I would have made a plan for the quilting so there wouldn't be as much over stitching as I ended up doing. Can't see it from 10' away so I'm dealing with it.
I'm going to make a ton of bean bags so the kids can practice their letters. Next project, after and in between, the valances, shams and wall hanging Dino's.
I did a very bad thing, I stopped into a shop which is now an HQ rep and was shopping for the Fusion and I stopped this for my studio. I'm going red, white and black, so, hopefully, it will blend in nicely. Someday, of course, it will be a UFO...say NO!!!!!
Comments
Post a Comment